Deviation

The module provides various methods to compute wellbore trajectory coordinates from survey data and generate 2D and 3D presentations of the wellbore path.

  • Computation of wellbore azimuth and inclination (tilt) from accelerometer and magnetometer components.
  • Classic and balanced tangential, radius, and minimum radius of curvature algorithms to derive trajectory coordinates.
  • Easy computation of TVD, TVDSS, Elevation and alternative depth references.
  • Closuredrift (closure distance), and DLS calculations.
  • Classic 2D top view (bull’s eye), vertical profile projection and drift view diagrams.
  • 3D Northing/Easting (cubic) and Drift/Closure (cylindrical) diagrams.
  • Multipath overlay (e.g., planned and drilled).
  • Target layer intersection.
  • Top View Projection.
  • Drift View
  • Vertical Profile Projection
  • Deviation - 3D Cylinder
  • 3D Cube View
  • 3D Cube Target Layer Intersection
CLOSE
  • Top View Projection.
  • Drift View
  • Vertical Profile Projection
  • Deviation - 3D Cylinder
  • 3D Cube View
  • 3D Cube Target Layer Intersection

1 of 20